Works with sales or order exports from Shopify, QuickBooks, Square or a spreadsheet: an item, the date and the units sold. Add on hand, unit cost or lead time columns to flag what to order and how much.
Reorder Point & Safety Stock: When should I reorder, and how much?
When to reorder each item, the safety stock to hold and how much to order (EOQ). You need sales by item and date. Upload and the answer appears, in your browser with no account and nothing uploaded. Once the answer is up you can also download the report in Excel, with live formulas.
What is a reorder point?
The reorder point is the stock level at which you should place a new order so it arrives before you run out. Safety stock covers busier than usual days; economic order quantity (EOQ) is the order size that keeps ordering and holding costs lowest.
How it is worked out
Average daily demand (d) and its standard deviation (σ) come from your sales history.
Safety stock = Z × σ × √lead time in days (Z from the service level you choose).
Reorder point = d × lead time + safety stock.
EOQ = √(2 × yearly demand × cost per order ÷ holding cost per unit per year).
How to read it
A higher service level means fewer stockouts but more cash tied up in safety stock.
Items selling in bursts need more safety stock than steady sellers with the same average.
Upload sales by item and date: order lines, or daily or weekly totals. For each item the report takes the average daily demand and how much it swings from day to day over every day the file covers, then applies the standard formulas: safety stock is Z × the standard deviation of daily demand × √lead time, the reorder point is daily demand × lead time + safety stock, and the economic order quantity is √(2 × yearly demand × cost per order ÷ holding cost per unit). Add an on hand column to see which items to order now, a unit cost column for EOQ, and a lead time column if suppliers differ. For how much stock you hold and which items carry most of its value, use Inventory Analysis.
How to run it
Export sales with the item, the date and the units sold. Add on hand, unit cost and lead time columns if you have them.
Upload it, enter the lead time in days and pick how sure you want to be of not running out.
Add the cost of placing an order and the yearly holding cost for EOQ, then download the workbook with every formula.
Frequently asked questions
How do you calculate a reorder point?
Reorder point = average daily demand × lead time in days + safety stock. If you sell 4 units a day, a delivery takes 6 days and you keep 10 units of safety stock, you reorder when stock falls to 4 × 6 + 10 = 34 units.
How do you calculate safety stock?
Safety stock = Z × the standard deviation of daily demand × √lead time. Z comes from how sure you want to be of not running out while an order is on its way: 1.28 for 90%, 1.65 for 95%, 1.96 for 97.5% and 2.33 for 99%.
What is the EOQ formula?
Economic order quantity = √(2 × yearly demand × cost per order ÷ holding cost per unit a year). The holding cost is a share of the unit cost (storage, insurance and money tied up), often 15% to 30% a year.
Do days without sales count?
Yes. Average daily demand and its standard deviation are taken over every day the file covers, with days without sales counted as zero, so slow sellers are not overstated. Weekly totals are read week by week and spread over seven days.